Rate Analysis
Cost Analysis of Ready Mix Concrete
Concept Concrete Ltd
Cost Analysis of Ready Mix Concrete
Materials
Converted Qty = Quantity ÷ Factor. Amount = Converted Qty × Unit Rate. Leave the factor at 1 when no conversion is needed.
Cement
0.00Quantity (Kg)
÷ Factor
Unit Rate
Converted: 0.000 Kg × 0.00 = 0.00
Stone
0.00Quantity (Kg)
÷ Factor
Unit Rate
Converted: 0.000 Kg × 0.00 = 0.00
Sand
0.00Quantity (Kg)
÷ Factor
Unit Rate
Converted: 0.000 Kg × 0.00 = 0.00
AdmixtureCement x 0.008
0.00Quantity (Kg)
0.000
÷ Factor
Unit Rate
Converted: 0.000 Kg × 0.00 = 0.00
Total Material Cost0.00
Transportation
kept separate — divided by 200, not 35.315
Fuel
0.00Quantity (Kg)
÷ Factor
Unit Rate
Converted: 0.000 Kg × 0.00 = 0.00
Rate Summary
Updates live as you type.
- Total Material Cost
- 0.00
- Base Amount
- 0.00
- Transportation (Fuel)
- 0.00
- Cost of Goods Sold
- 0.00
- Total Cost
- 33.00
- Profit (5.00%)
- 1.65
- Pump Charge
- 3.00
Sum of the 4 material amounts
0.00 ÷ 35.315
0.00 ÷ 200
0.00 + 0.00
0.00 + 33 constant
33.00 × 5%
Flat, added after profit
Final Total Rate
33.00 + 1.65 + 3.00
37.65
Material cost is 0.0% of the final rate
Control Panel
Every constant in the formula is editable here.
Shared by every row · default Kg
Admixture Qty = Cement Qty x this · default 0.008
Total Material Cost / this · default 35.315
Fuel amount / this · default 200
Overhead, added to Cost of Goods Sold · default 33
Applied on Total Cost · default 5
Flat, added after profit · default 3